Springfield & the metro

Site prep & pads

$2,000–$15,000+

Typical local range. Not your quote.

A pad the next trade can use. Cut and fill balanced on the lot when the dirt can stay, gravel where the drawing calls for it.

New houses, shops, and commercial pads

Price this job
Staked building pad with a gravel base

In the price

  • Building pad to the string line
  • Rough grade that drains away from the building
  • Access for concrete and lumber trucks

What moves it

  • Pad size and how much cut versus fill
  • Import or export of dirt
  • Compaction the inspector will test
  • How tight the lot is to the neighbor